We provide complex services during the undertakings for which it is required to have the area supervised by architects, and surveyed and supervised by archaeologists. We operate in line with the requirements of the province historic monuments conservation office.


The scope of our services encompasses:

  • pre-investment complex archaeological and archaeological-architectural surveys complying with the requirements of the province historic monuments conservation office
  • archaeological and heritage conservator supervision
  • development of research programmes
  • gathering information and archaeological data (expert opinions, dating)
  • drawing up documents required when filing for earthworks permit from the province historic monuments conservation office

Recent works:

NO

TASK

DATE

1.

Archaeological survey conducted during construction of single family houses and technical infrastructure on plot no. 378 in Kiełczów, Długołęka commune. - archaeological survey of a settlement from the Migration Period (decision no. 1000/2007-1004/2007 dated Aug 21, 2007; 218-220/2007 dated Mar 8, 2007).

I stage:
18.06. - 31.08.2007r.
II stage:
01.10. - 31.10.2007r.

2.

Archaeological survey conducted during construction of sanitary and rainwater sewage network and reconstruction of paving of Milicka st. in Sułów (7th stage of the undertaking)
- archaeological survey in the historic medieval and modern period town of Sułów, and verification of the range of the historic archaeological sites no.: 1/96/72-30 AZP - traces of Lusatian culture and early medieval settlement from the 14th -15th c. and a cemetery from the period of the Swedish Deluge; 5/100/72-30AZP - early medieval settlement; site 24/119 AZP 72-30 - traces of the Neolithic Period, the Early and Late Middle Ages and the modern period (decision no. 188/2008 dated Feb 20, 2008).

I stage:
25.02. - 04.04.2008r.
II stage:
05.05. - 12.09.2008r.

3.

Archaeological survey conducted during construction of water main in Gruszeczka, Milicz commune
- archaeological survey in a historic medieval village and within the archaeological sites no.: 1/92/72-30 AZP and 2/93/72-30 AZP being traces of modern settlement from the 16th-17th c., and 7/102/72-30 AZP - settlements of Komornica culture, Pit-Comb Ware culture and a trace of Lusatian culture settlement from the Hallstatt period (decision no. 377/2008 dated Apr 18, 2008).

07.07. - 10.10.2008r.

4.

Archaeological survey conducted during construction of ADIF Sp. z o.o. production plant in Wrocław, Bierutowska st. - verification survey of the existing archaeological sites (decision no. 991/2008 dated Aug 11, 2008).

19.08. - 26.09.2008r.

5.

Archaeological survey conducted during extension of the Robert Bosch Sp. z o. o. production plant, Mirków branch, Długołęka commune,br> - verification survey within the archaeological site no. 3/49/79-30 AZP, being late medieval trace of settlement (decision no. 730/2008 dated 11.06.2008r.)

16.09. - 17.10.2008r.

6.

Archaeological survey during construction of multi-family dwelling complex in the area of Piotrkowska st., plots no. 12 and 13/1 AM, district Stabłowice in Wrocław
- archaeological verification survey in the area of archaeological sites and in direct vicinity of the site no. 36/89/79-27 AZP being a trace of late medieval settlement - modern period, and on the conservation area stipulated in the local land development plan for the Stabłowice Stare urban complex (resolution of the town council dated 06.04.2006) (decision no. 587/2008 dated 12.05.2008r.)

22.10. - 28.11.2008r.

7.

Archaeological survey during construction of MV and LV cable lines and disassembly of overhead MV line, and during repairs of LV overhead line in Sobótka, Sobótka commune
- archaeological survey in the historic town of Sobótka registered in the register of monuments under no. 449 pursuant to the decision dated Dec 8, 1958 and within the „OW” conservation area (archaeological observation) defined for the medieval town (decision no. 125/2008 dated Feb 1, 2008; 44/2009 dated Jan 14, 2009)

25.11. - 31.12.2008r.
09.02. - 10.04.2009r.

8.

Archaeological survey during construction and reconstruction of the back of the property no. 204 at Powstańców Śląskich st. in Wrocław
- archaeological survey on the archaeological site no. 346 as per conservation guidelines (9-records)-late medieval settlement (decision no. 1070/2008 dated Aug 26, 2008).

03.12. - 19.12.2008r.

9.

Archaeological-architectural survey during construction of the fountain in Oławska st. in Wrocław, the section between Szewska st. and Dominikański sq.
- archaeological-architectural survey within the area of the urban complex registered in the register of monuments under no. 212 pursuant to the decision dated May 12, 1967 (decision no. 1268/2008 dated Oct 3, 2008 1721/2008 dated Jan 16, 2009, 137/2009 dated Jan 28, 2009)

02.02. - 31.03.2009r.